Austin Estate

17 audio zones · 8 video zones · Golf/Theater · Cameras · Shades · HVAC

◆ THE PROJECT

A complete home.

Four months. Every room. Scott and the Bellah team wired, programmed, and calibrated a full estate from scratch — 17 audio zones, 8 video zones, a 7.2 golf and theater room, whole-home lighting control, motorized shades, cameras, and HVAC. All running on Control4.

17
Audio Zones
8
Video Zones
7.2
Golf / Theater
Living Room — Bellah Audio Austin project
Living Room

The focal point of the main floor. The fireplace wall became the display wall — a 75" panel integrated into custom millwork, surrounded by in-wall speakers tuned to the room. All of it controlled from a single touchscreen or the app.

Wet Bar — Bellah Audio Austin project
Wet Bar

A full wet bar with a 55" display integrated into the dramatic marble backsplash. Audio runs seamlessly from the main living space. One source, any room.

Master Bedroom — Bellah Audio Austin project
Master Bedroom

High vaulted ceilings with exposed beams. Six in-ceiling speakers — completely invisible against the white plaster. The room sounds like a concert hall and you'd never know it.

Primary Closet — Bellah Audio Austin project
Primary Closet

The same audio system that plays in the bedroom follows into the closet. Flush in-ceiling speakers, tuned to the space. No compromise, no shortcuts.

Home Office — Bellah Audio Austin project
Home Office

A Samsung Frame TV mounted on a marble feature wall. The office doubles as a media room — art mode when you're working, full cinema when you're not.

Office / Library — Bellah Audio Austin project
Office / Library

The other angle: custom dark shelving, in-ceiling speakers overhead, and lighting on a scene-based Control4 schedule. Three lighting presets — focus, meeting, off.

Golf / Theater Room — Bellah Audio Austin project
Golf / Theater Room

The room that defines this project. A 7.2 surround system, a Panasonic 4K laser projector, theater seating, and a full golf simulator in the same space. One room, two worlds.

Golf Simulator — Bellah Audio Austin project
Golf Simulator

The simulation screen and acoustic treatment. The room was designed for both — the system knows which mode you're in and configures accordingly.

Outdoor Patio — Bellah Audio Austin project
Outdoor Patio

The covered rear patio: weatherproof display, outdoor-rated ceiling audio, and connected to the same Control4 system as every room inside.

Game Room — Bellah Audio Austin project
Game Room

Game room with in-ceiling speakers and a wall-mounted display. Whole-home audio extends here too — 17 zones means every room, no exceptions.

Home Gym — Bellah Audio Austin project
Home Gym

The home gym has its own audio zone and two displays. The infrared sauna in the corner is on the HVAC integration — climate control throughout the property is on Control4.

Control4 System — Bellah Audio Austin project
Control4 System

The nervous system. A Control4 touchscreen in the kitchen controls every zone, every device, every scene in the home. One interface, total command.

Pool & Outdoor — Bellah Audio Austin project
Pool & Outdoor

The pool deck and backyard — outdoor audio zone with in-wall speakers concealed in the fence line. Weather-rated, tuned for open air.

Outdoor Speaker — Bellah Audio Austin project
Outdoor Speaker

One of the outdoor speakers mounted flush in the fence — completely invisible until you know what you're looking at.

◆ START A CONVERSATION

Ready to talk about your home?

Every project starts with a walkthrough. No charge, no commitment — just Scott walking the space and listening.

Book a Free Walkthrough
Tap to call (512) 801-9030or book online →